On October 19, 2023, the Cascina Disma facility (6 MW) was energized. Its construction is part of a framework agreement with a leading operator in the sector for the design and execution of 6 photovoltaic plants in Piedmont, totaling 40MW.
Located in the municipality of Sezzadio (Alessandria), the facility extends over 8 hectares of land and consists of 335 tracker structures and 11,268 photovoltaic modules.